Concrete Batching Plants Official Website for Haomei Machinery

Maintenance of Concrete Batching Plants

Brief Introduction:Ensure concrete batching plants and the surrounding environment clean.Remove the accumulated material in the hopper in time and sensor is normally reset to zero.

Daily Maintenance Work of Concrete Batching Plants

1. Ensure concrete batching plants and the surrounding environment clean.
2. Remove the accumulated material in the hopper in time and sensor is normally reset to zero.
3. Check the oil lubrication points adequacy of the gas system in the mist should maintain an adequate amount of oil.
4. Check whether the motor overheating and abnormal noise. If indicating the instrument is normal and the signal system is intact.
5. Regular checks, adjust the cylinder, butterfly valves and electromagnetic valves so that opening and closing to meet the requirements.
6. Regular check the system and timely solving ash leakage, oil spills and leakage electricity and other phenomena.
7. Stirrer and hopper should be cleaned once every four hours in order to avoid residual concrete consolidation and impede the normal operation.
8, Let internal water go from air compressor, air tank and filter.  Remove the operation fault.
9. Butterfly valves, agitators, solenoid valves, air filters and oil mist shall be repaired in accordance with the instructions.

Through the above methods for the concrete batching plants maintenance can make the concrete batching plant service life longer

Maintenance of Concrete Batching Plants