Brief Introduction:Seven steps for installation of mobile ready mix concrete plants are as below.

  Seven steps for installation of mobile ready mix concrete plants are as below.

  (1) Installation of belt conveyor

  Unfold the finished belt conveyor from the bend, place the rear frame on its base, connect the front and rear frames, then connect the front and rear legs to the conveyor, and connect the diagonal brace to the lifting lugs on the frame Then, lift the front of the conveyor, connect the front and rear legs and the diagonal brace, and then fasten the anchor bolts of the front and rear legs.

  (2) Installation of mixing host and powder batching system

  Lift the mainframe, place it on the foundation, and fasten its anchor bolts.

  (3) Installation of storage hopper of a mobile concrete plant

  Lift the finished product storage hopper, stand uprights, and connect the walking platform, ladder and finished product storage hopper.

  (4) Installation of concrete batching machine
mobile ready mix concrete plant

  Lift the concrete batching machine on its foundation, connect the plug board, put the heightened plates on both sides and connect it with the plug board, then unfold the original aggregate conveyor, connect the front and rear frames, so that The electric drum is aligned with the center of the mixer hood hole, and then the anchor bolts are fastened.

  (5) Installation of cement silos for a mobile ready mix concrete plant

  Assemble the components of the cement silo one by one on the ground, lift the cement silo, and place the side of the lower silo body support to the powder batching system, fix the upper and lower silo body, and then fix the anchor bolts.

  (6) Installation of screw conveyors

  Lift the screw conveyor, connect the screw conveyor ball hinge with the cement hopper outlet, make the outlet align with the powder hopper inlet, then connect the conveyor to the cement bin lifting ear with a wire rope, and then connect the ground The foot bolts are fixed.

  (7) Lift the pump and put it in a suitable position, and connect the output water pipe.

  (8) Place the air compressor on the side of the finished hopper, connect the air compressor outlet to the air control box inlet with a gas pipe, and connect the air control box outlet to the air pipe of the cement silo.